Roof deck railing post flashing my problem is a little different.
Post to membrane roof connector.
Gutters of timber plywood or reinforced concrete may be faced inside with thermal insu lation boards selected and fixed according to the local standards in force.
Find post connector deck connectors at lowe s today.
Post is 2 5 round high strength steel.
Roof anchor 1 roof post 1 truss boss anchor 1 view all.
Attaches to the surface of existing roof structures quick easy installation reduces cost requiring minimal labor and eliminating the need for roof penetration and repair.
D bolt forged anchorage connector 420 lb weight capacity attaches to concrete wood.
Adjustable sleeve can be any desired height.
A typical 100 square roof with two layers of polyiso insulation can be mechanically attached and the roof fully closed up in five days with an optimum crew.
There are savings to be had in its cost effectiveness for businesses almost anywhere.
Round post with slip on caps.
Client has a tiled outside deck over a living area it doesn t leak.
Slip on caps are 100 stainless steel.
It is essential to place 2x12 blocking on the flat between the sleepers at post locations so the lags will have something solid to bite into.
Minimal section this depends on the surface of the roof being arranged the pitch of the gut ter and the nature of the constituent materials.
The roofscreen round post attachments with slip on caps provide more flexibility for height because the slip on cap and roof flashing boot are independent of each other.
Fusion roof anchor post can accommodate most industrial roof designs including standing seam membrane built up metal sheathing concrete and wood.
With the bright white reflective attributes of tpo there is money to be saved on energy usage during the warmest months of the year.
It s the simplest and lowest cost way of applying a heat welded single ply system that can practically be installed year round with warranties of up to 30 years.
10 years ago copper flashing torched membrane with two staircases.
Hello everyone looking for some advice on our clients second story deck above a sunroom with flat roof above.
The screws or lags should be as long as possible without protruding from the bottom of the sleepers and putting holes in the roof membrane.
Client had the deck replaced approx.